1. Define the event and authority

Name the event in business language and explain what it authorizes or confirms. Identify the system that creates it, the system that may change it, and the consumers that act on it. Distinguish requests from confirmations and technical acceptance from completed processing. Use one concrete transaction to verify the meaning with business owners. Worksheet output: event name, trigger, authoritative source, expected target state, and the people authorized to approve changes to that meaning.

2. Specify identity and relationships

List the references needed to trace the transaction across systems. Include relevant order, line, shipment, handling-unit, item, owner, and version context. Define which identifiers remain stable during retry and which represent a new event. Describe parent-child relationships and partial quantities where applicable. Do not assume a human-readable document number is unique across sites or customers. Worksheet output: an identifier table showing scope, uniqueness, source, target use, and the relationship each key preserves.

3. Define data and validation

For each meaningful field, record the definition, type, unit, allowed values, requirement, transformation, and owner. Specify the response to missing, invalid, or unknown data. Include status mappings and date or time semantics. Test examples at realistic boundaries rather than only short, complete values. Reject or route uncertain data where the business requires it instead of silently assigning plausible defaults. Worksheet output: a mapping table plus valid and invalid example messages using safe non-production information.

4. Agree sequencing and duplicate behavior

Identify prerequisites and the handling of delayed or out-of-order events. Define how duplicates are recognized and what the sender receives when the original event already completed. Examine timeouts after partial processing and concurrent repeated requests. Use supported product behavior and verify assumptions in the relevant environment. Worksheet output: a state-transition description covering first delivery, duplicate delivery, late update, missing prerequisite, partial completion, and the evidence needed to determine the final business outcome.

5. Design recovery and reconciliation

For each failure category, specify the investigation owner, permitted action, required approval, and verification step. Describe how expected events are compared with actual business records, including in-flight work and time boundaries. Avoid assuming that all failures can be fixed by replay. Preserve the original references during recovery and record the intervention. Worksheet output: a recovery matrix and reconciliation procedure that the support team can follow without reconstructing the design from source code.

6. Define access, monitoring, and operating responsibility

Document supported authentication and secret handling without placing real credentials in the workbook. Apply appropriate permissions and data minimization. Decide which events are logged, how long relevant evidence is retained under policy, and what an actionable alert contains. Name the teams responsible for both sides of the exchange and their escalation handoff. Worksheet output: an operating ownership map, safe diagnostic reference list, and monitoring criteria connected to warehouse consequences rather than only connection availability.

7. Connect the contract to acceptance

Build tests from the agreed business and failure scenarios. Verify normal, partial, duplicate, delayed, rejected, and corrected transactions. Include representative downstream reconciliation and the support recovery procedure. Record product versions and configuration assumptions. Treat changes to meaning or required fields as controlled contract changes, not incidental developer edits. Worksheet output: a traceability matrix linking contract requirements to test evidence, remaining limitations, acceptance owners, and the exact release approved for deployment.

Use with your team

Working checklist

Checks are temporary and are not saved or submitted. Use Print / save PDF for your working copy.

Educational guidance. Apply it to your product, version, operating conditions, and agreed controls; it is not a project-specific solution design.

Explore development & integration